WWTP Osh, Kyrgyzstan







Period:
Location:
Task:
WWTP Osh, Kyrgyzstan
Over 20 years after independence of Kyrgyzstan, basic infrastructure has been continuously deteriorating because of inefficient management, lack of preventive maintenance and reduced capital investments. The waste water treatment plant in Osh was designed in 1969 based on a conventional activated sludge process. The treatment efficiency of the WWTP was poor because the mechanical treatment was only partially in operation condition and the activated sludge treatment was not operated properly. With the rehabilitation of the mechanical treatment the effluent efficiency is improved and the pre-condition for the rehabilitation of the biological treatment is set.
Civil Works:
Concrete Rehabilitation of fine screen channels and settling tanks
Rehabilitation of complete screening building with operators room and sludge pumping station
Concrete rehabilitation of primary clarifier
Mechanical Installation:
6 Penstocks, 3 coarse screens, 3 fine screens, belt conveyer, screening press
Sand pumps, PEDH piping and sand dewatering unit
4 primary clarifier with circular scrapers incl. swimming sludge removal system
Complete sludge pumping station incl. PEDH piping and valves
Inflow measurement
Automation and Control:
SCADA System
Monitoring and control equipment
Additional Services:
Generator Set