Water Meter Bishkek

Well Field Sigma Kara Balta
Control Panel
Electrical installation and tests
Programming the control system
Installed water meter
Display and electrical panel of installed water meters

Task:

Supply of ultrasonic and electromagnetic flow water meters for installation in well-fields.


Period:

March 2014 - September 2015


Principal:

PED Bishkekvodokanal Bishkek


Financed by:

Government of the Swiss Confederation, State Secretariat for Economic Affairs (SECO), admin. by EBRD


Consultant:

Holinger AG


Location:

Bishkek, Kyrgyzstan

Elements of Project

  • Supply and installation of ultrasonic clamp-on flow meters fo the installation on steel pipes

  • Supply and installation of electromagnetic flow meters fo the installation in steel pipes

  • Construction of weather proof cabines for the installation of floe meter transmitter

  • SCADA system including equipment, devices and accessories for data transfer and registration

  • Training for Installation, Operation and Maintenance of the watermeters

  • Training for the SCADA System


Kyrgyzstan