Officially, 62% of the rural population in Uzbekistan has access to safe drinking water and less than 30% to sewerage systems; the needs are still significant. The drinking water infrastructure was mainly built during the soviet times and is in bad condition. The rehabilitation of the water supply system in Samarkand will provide safe drinking water to urban and rural residents and provide tools for the management of the water resources.
Mechanical Installation
4 drinking water network pumps with capacity of each 150m3/h, 5bar for pumping station 28th district
Complete hypochlorite chlorination station
6 Groundwater Wells with pump capacity of each 60m3/h, 6bar for wellfield Charkhim
Piping incl. Valves, Flow Meter etc.
Installation of well boxes
Electrical Installation
2 x Transformer station for pumping station 6kV/400V
Frequency inverters, switchboards and cabling for pumping station and well fields
Automation and Control
Pump control system including SCADA and PLC
Principal:
Financed By: