Pumping Station
Pumping Station
Outside View
Pumping Station
Pumping Station
4 split case pumps (each 1'500 m3/h) and 2 Surge Vessels (each 22.5 m3)
Pumping Station
Pumping Station
Booster Station
Pumping Station
Pumping Station
Electrical and Control Panels
Pumping Station
Pumping Station
SCADA System
Pumping Station
Pumping Station
Frequency Converters
New Substation 35/6kV
New Substation 35/6kV
Transformers and Switchgears 35/6kV
New Substation 35/6kV
New Substation 35/6kV
Transformers and Switchgears 35/6kV
New Substation 35/6kV
New Substation 35/6kV
Installation of new transformer 35/6kV, 4'000VA
New Substation 35/6kV
New Substation 35/6kV
Switchgears 6kV Side
New Substation 35/6kV
New Substation 35/6kV
Switchgears 35kV Side
Well Circle
Well Circle
Installation of Wellhead to the flexible hose riser pipes
Well Circle
Well Circle
Installation of Wellhead to the flexible hose riser pipes
Groundwater Wells
Groundwater Wells
Installation of a new well pump with flexible hose riser pipes.
Groundwater Wells
Groundwater Wells
New well head and piping including water meter, manometer etc. in a well box at Beshbulok well field.
Well Circle
Well Circle
Control Room
Well Circle
Well Circle
Transformer
Chlorination Building
Chlorination Building
Chlorination System
Chlorination Building
Chlorination Building
Chlorination System
Chlorination Building
Chlorination Building
Electrical and Control Panels
Groundwater Wells
Groundwater Wells
Video investigation of a cleaned and rehabilitated well.
Groundwater Wells
Groundwater Wells
Drilling of new groundwater well
Manifold Wells
Manifold Wells
The valves in the well manifold will be replaced.
Manifold Wells
Manifold Wells
New Butterfly Valves DN400 in the well manifold
New Gate Valves
New Gate Valves
Installation of new gate valves
New Gate Valves
New Gate Valves
Installation of new gate valves with Straub ® pipe couplings
ExistingTransmission Pipeline
ExistingTransmission Pipeline
Air Valves in Higher points
Existing Transmission Pipeline
Existing Transmission Pipeline
Air Valves in Higher points

Syrdarya Water Supply Project

Officially, 62% of the rural population in Uzbekistan has access to safe drinking water and less than 30% to sewerage systems; the needs are still significant. The drinking water infrastructure was mainly built during the soviet times and is in bad condition. For the Bukhara and Samarkand Water Supply Project, launched in 2003, FELA Planungs AG successfully rehabilitated key elements of the water supply system (e.g. pumping stations, water metering, network rehabilitation). The rehabilitation of the water supply system in Syrdarya province will provide safe drinking water to urban and rural residents and provide tools for the management of the water resources.


Task:

Rehabilitation of Beshbulok Pumping Station and its Wellfield


Period:

 June 2016 - February 2018


Location:

Syrdarya, Beshbulok, Uzbekistan

Pumping Station:

    • Installation of new Pumping Station incl. connection to existing pressure and suction pipes

    • 4 split case pumps (each 1'500 m3/h) and 2 Surge Vessels (each 22.5 m3)

    • 2 Surge Vessels (V=22.5m3)

    • Stainless Steel Piping (DN400 to DN1200) incl. Valves, Flow Meter etc.

    • New Electrolysis Chlorination Station

Groundwater Wells:

    • Drilling and construction of 4 new wells

    • Regeneration and de-silting of 24 exsiting wells

    • New submersible pumps (180m3/h), riser pipes (DN150) and construction of well boxes for all 28 wells

    • New Valve Chambers in Manifold between Wells and Reservoir (DN400 and DN800)

Electrical Installation:

    • New high voltage distribution 35kV and connection to transmission lines

    • 2 new 35 kV/6 kV, 4 MVA oil-immersed transformers and medium voltage distribution 6kV

    • 2 new Transformer 6kV/400V for Pumping Station and 14 Transformer 6kV/400V for wells

Automation and Control:

    • New SCADA system for Well field and Pumping Station

    • Communication with Reservoir Severnaja

       


Principal:

Syrdarya Regional Production Enterprise (RPE) Suvokova

Financed by:

Government of the Swiss Confederation, State Secretariat for Economic Affairs (SECO)

Consultant:

Holinger AG