Syrdarya Water Supply Project
Officially, 62% of the rural population in Uzbekistan has access to safe drinking water and less than 30% to sewerage systems; the needs are still significant. The drinking water infrastructure was mainly built during the soviet times and is in bad condition. For the Bukhara and Samarkand Water Supply Project, launched in 2003, FELA Planungs AG successfully rehabilitated key elements of the water supply system (e.g. pumping stations, water metering, network rehabilitation). The rehabilitation of the water supply system in Syrdarya province will provide safe drinking water to urban and rural residents and provide tools for the management of the water resources.
Task:
Rehabilitation of Beshbulok Pumping Station and its Wellfield
Period:
June 2016 - February 2018
Location:
Syrdarya, Beshbulok, Uzbekistan
Pumping Station:
-
Installation of new Pumping Station incl. connection to existing pressure and suction pipes
-
4 split case pumps (each 1'500 m3/h) and 2 Surge Vessels (each 22.5 m3)
-
2 Surge Vessels (V=22.5m3)
-
Stainless Steel Piping (DN400 to DN1200) incl. Valves, Flow Meter etc.
-
New Electrolysis Chlorination Station
Groundwater Wells:
-
Drilling and construction of 4 new wells
-
Regeneration and de-silting of 24 exsiting wells
-
New submersible pumps (180m3/h), riser pipes (DN150) and construction of well boxes for all 28 wells
-
New Valve Chambers in Manifold between Wells and Reservoir (DN400 and DN800)
Electrical Installation:
-
New high voltage distribution 35kV and connection to transmission lines
-
2 new 35 kV/6 kV, 4 MVA oil-immersed transformers and medium voltage distribution 6kV
-
2 new Transformer 6kV/400V for Pumping Station and 14 Transformer 6kV/400V for wells
Automation and Control:
-
New SCADA system for Well field and Pumping Station
-
Communication with Reservoir Severnaja