Thermal Substations Karl Marx and Bazhenova, Vinnytsia

Thermal Substations Karl Marx and Bazhenova, Vinnytsia Period: June 2013 – November 2014 Location: Karl Marx and Bazhenova, Vinnytsia, Ukraine Task: Procurement of Thermal Substations (TS), SCADA system components and associated services for Karl Marx and Bazhenova district in Vinnytsia, Ukraine. In the frame work of the Energy Efficiency Vinnitsa Project. Thermal Substations Karl Marx and Bazhenova, Vinnytsia Energy security is a major policy issue in Ukraine, and its dependency on external supplies is exacerbated by the low efficiency of energy use. In the city of Vinnytsia the “European Energy Award municipal energy management system” was successfully introduced in order to enhance the living conditions of the population and the energy independence of the country. The optimization of the district heating system operation for thermal substations improves the consumers’ service standard and the energy efficiency. Supply of: 51 factory assembled Thermal Substations for Karl Marx district 49 factory assembled Thermal Substations for Bazhenova district Hydraulic and electrical connections between the different frames of the TS Automation and Control: Implementation of SCADA system 1 Server and 2 operation stations Network cable connection to all Thermal Substations Additional Services: Supervising of the connecting the TS to the utility network Testing and commissioning Training of operating staff Principal: Financed By: Consulatant:
Thermal Substations Kamjanez-Podilskyi

Thermal Substations Kamjanez-Podilskyi Period: February 2016 – October 2016 Location: Kamyanets-Podilskyi, Khmelnytskyi Region, Ukraine Task: Supply and installation of 67 thermal substations for 67 objects in the city of Kamyanets-Podilskyi. Thermal Substations Kamjanez-Podilskyi Energy security is a major policy issue in Ukraine, and its dependency on external supplies is exacerbated by the low efficiency of energy use. The optimization of the district heating system operation for thermal substations improves the consumers’ service standard and the energy efficiency and enhances the energy independence of the country. Design, supply and installation of: 67 individual heating stations (IHS) Connection of the IHS to the district heat supply system Control, measuring and safety control equiptemt Electrical isntallations Additional Service Trial rund and commissioning of the installed equipment Training of the maintenance personal Principal: Financed By: Consulatant:
Thermal Substations Vyshenka, Vinnytsia

Thermal Substations Vyshenka, Vinnytsia Period: July 2018 – April 2019 Location: Vyshenka, Vinnytsia, Ukraine Task: Procurement of Thermal Substations (TS), SCADA system components and associated services for Vyshenka district in Vinnytsia, Ukraine. Thermal Substations Vyshenka, Vinnytsia Energy security is a major policy issue in Ukraine, and its dependency on external supplies is exacerbated by the low efficiency of energy use. In the city of Vinnytsia the “European Energy Award municipal energy management system” was successfully introduced in order to enhance the living conditions of the population and the energy independence of the country. The optimization of the district heating system operation for thermal substations improves the consumers’ service standard and the energy efficiency. SUPPLY OF: Delivery of 96 factory assembled Thermal Substations SCADA System components Hydraulic and electrical connections between the different frames of the TS ADDITIONAL SERVICE: Supervising of the connecting the TS to the utility network Testing and commissioning Training of operating staff Principal: Financed By: Consulatant:
Pre-Insulated Pipes Zhytomyr

Pre-Insulated Pipes Zhytomyr Period: May 2017 – June 2018 Location: Zhytomyr, Ukraine Task: Energy Efficiency Zhytomyr Project: Procurement of pre-insulated system elements (pipes) and associated services for Zhytomyr City. Pre-Insulated Pipes Zhytomyr Energy security is a major policy issue in Ukraine, and its dependency on external supplies is exacerbated by the low efficiency of energy use. The optimization of the district heating system with installation of pre-insulated pipes improves the consumers’ service standard and the energy efficiency and enhances the energy independence of the country. Supply of: 2’378 m Steel welded pre-insulated pipes for underground laying DN32-DN300 including fittings 8’673 m Steel welded pre-insulated pipes for overground laying DN32-DN300 including fittings 357 m SPIRO pipes for on-ground laying DN250 including fittings Additional Services: Training for installation, commissioning, operation, maintenance and repair Supervision of the goods assembly on site and of the commissioning Local insulatation with polyurethane foam and end insulation Installation, testing and commissioning of the leakage monitoring system Review and approval of pipe stress calculation Principal: Financed By: Consulatant:
Procurement of pre-insulated pipes for Tarnogrodskogo, Vinnytsia

Procurement of pre-insulated pipes for Tarnogrodskogo, Vinnytsia Period: March 2016 – October 2016 Location: Vinnytsia, Tarnogrodskogo, Ukraine Task: Ennergy Efficiency Vinnytsia Project: Procurement of pre-insulated system elements (pipes) and associated services for Zulinskiy (Tarnogrodskogo) district in Vinnytsia. Procurement of pre-insulated pipes for Tarnogrodskogo, Vinnytsia Energy security is a major policy issue in Ukraine, and its dependency on external supplies is exacerbated by the low efficiency of energy use. In the city of Vinnytsia the “European Energy Award municipal energy management system” was successfully introduced in order to enhance the living conditions of the population and the energy independence of the country. The optimization of the district heating system with installation of pre-insulated pipes improves the consumers’ service standard and the energy efficiency. Supply of: 15’454 m Steel pre-insulated pipes for underground laying 478 m Polyethylene pre-insulated pipes 532 m SPIRO pipes for on-ground laying 115 m non insulated steel pipes 55 m Steel pipes with “heavy duty” type insulation Additional Service: Training for installation, commissioning, operation, maintenance and repairs Supervision of the goods assembly on site and of the commissioning Local insulatation with polyurethane foam and end insulation Installation, testing and commissioning of the leakage monitoring system. Review and approvalof pipe stress calculation Principal: Financed By: Consulatant:
Thermal Substations Tarnogrodskogo, Vinnytsia

Thermal Substations Tarnogrodskogo, Vinnytsia Period: March 2016 – October 2016 Location: Tarnogrodskogo, Vinnytsia, Ukraine Task: Procurement of Thermal Substations (TS), SCADA system components and associated services for Ternogrodskogo district in Vinnytsia, Ukraine. Thermal Substations Tarnogrodskogo, Vinnytsia Energy security is a major policy issue in Ukraine, and its dependency on external supplies is exacerbated by the low efficiency of energy use. In the city of Vinnytsia the “European Energy Award municipal energy management system” was successfully introduced in order to enhance the living conditions of the population and the energy independence of the country. The optimization of the district heating system operation for thermal substations improves the consumers’ service standard and the energy efficiency. Supply of: Delivery of 68 factory assembled Thermal Substations SCADA System components Hydraulic and electrical connections between the different frames of the TS Additional Service: Supervising of the connecting the TS to the utility network Testing and commissioning Training of operating staff Principal: Financed By: Consulatant: